AT A GLANCE
Financial Highlights
Project Highlights
The Project Highlights
Project Highlights
|
OVERVIEWThe client is a leading manufacture and distributor of personal vision correction products. This project was conducted in the facilities that are responsible for the manufacturing and packaging of products that are shipped to retailers, wholesalers, and private label distributors. The client recognized a need to increase productivity within their operation in order to meet forecasted operating budgets that were not being achieved. They were experiencing excessive cost in what they considered to be a new and state of the art facility where they had been unsuccessful over the past several years in correcting unfavorable trends in processing efficiency and overall unit cost. Existing data prior to the Adept engagement revealed that changeover times between product runs were excessive, unscheduled equipment downtime was increasing, and production line efficiencies were decreasing in both the manufacturing and assembly areas. Scrap and product losses were also increasing. Adept began a 3 week assessment of the manufacturing and assembly operations in 2 of the client's facilities. The assessment consisted of both production and behavioral work studies. These studies were conduct by trained and experienced Adept Management professionals. By focusing on the current state management systems and production process, and the behaviors of the frontline management team that controlled both human and equipment resources, the assessment produced the following findings:
Throughout the assessment, the client received regular briefings that enabled them to understand and validate the findings. The Assessments concluded with a detailed presentation and summary of all of the findings After receiving the Assessment briefing on the findings and detailed quantification of the opportunity, the client reviewed and approved the initial project approach. The approach included a guaranteed ROI of 1 to 1 and a projected 3 to 1 return 12 months after the conclusion of the implementation. The project approach called for a coordinated effort that addressed unsatisfactory behaviors within the frontline management team. In addition to addressing the behaviors, the project called for the development and/or upgrading of current management tools that were being used to run manufacturing and production operations. By addressing the behaviors and management systems, the culture began a change process that would achieve remarkable and sustainable results. The project implementation methodology called for both on the floor coaching as well as the facilitation of workshops for managers and supervisors on core competencies such as:
Supervisors were taught the importance of, and how to give good measurable work assignments. The Adept professionals also worked with supervisors on-the-floor to develop new management system tools to quickly allow root cause analysis of critical barriers. Managers and supervisors were also coached and taught how to address typical employee problems such as poor work performance in a professional manor which was consistent with company policies. Cross functional work teams consisted of hourly employees and management team members were formed to improve line changeovers resulting in significant reduction in changeover times. Additionally supervisors began to control the scheduling of overtime due to their increased accountability for reporting production results. By the conclusion of the project the management team had designed and implemented a management system that increased efficiencies by 14% across all of the manufacturing and assembly lines. The culture change in the organization was driven by the new behaviors of the management team which positioned the organization to sustain the improved operating results as well as provide the flexibility required to make critical adjustments as the business adapted to changing business climates. |